Excited that Construction has started on CP2 at the West Portal Entrance.
hb+a Architects designed both East and West Portals at the start and culmination of the 5 mile tunnel, alongwith with cut and cover integration.
Other services included, wayfinding and signage, sustainability consulting and egress from tracks.

 

https://www.vta.org/blog/behind-scenes-bart-silicon-valley-phase-ii-west-portal-construction-site