3 Story New Portal on the Airfield Side connected to the existing Boarding Area G with a pedestrian bridge on the 3rd floor.

Status

Completed : 2016

Size

6000 SF

Client

San Francisco International Airport

Scope

Programming, Master Planning, Conceptual Design, Design Development

Project Team
  • Hafsa Burt, AIA
  • Paul Cahill
Project Collaborators
  • Executed as an association with Gerson/Overstreet Architects
  • MEP: WSP
  • Structural: SOHA Engineering
  • Civil: Telamon Engineering